Project:
Tocantins Railway Terminal
Sector: Industrial | Transportation
What we have done: Engineering Design
Desafios

Challenges:

  • Geotechnical analysis;
  • Changed of the entire design of foundation and structure;
  • Buried hopper project (25m deep).
Soluções

Solutions:

  • Definition of faster and more effective solutions;
  • Reduction of ⅔ on the original number of piles;
  • End-to-end engineering design.
Resultados

Results:

  • Capex and lead time reduction.